I have been working as an engineer for over 20 years and recently I asked myself as to how many projects I have worked on that were successful.
What is a Successful Project?
This is a complex question as that I have done a lot of contract work, directly or indirectly through employer. As such I have made money which is a success but was the work I did successful? So to define successful I would say that the work you did created value in society more than it cost to develop. For products this means you have made more profit on product than it cost to develop. For other contract it work this is harder to measure, for example writing a new algorithm for customer is harder to measure value. So lets focus on the products.
I went through and found that I have maybe worked on 4 products which were sold and made a profit. While in my time I bet I have worked on over 100 product designs. So basically only about 4% of the product designs I have worked on ended up making a profit. Out of that 4% a couple have made 100s of millions in profit for the company I did them for so at least that is reassuring.
When I look back I figure that this 4% is about right, that is 4% of the work I have done in my career ended up creating value. This is kind of depressing to think about. That is the long hours I spent working were not worth the effort in the end.
So why is this number so low and what could have been done different?
Asking this question is the heart of good engineering, see the blog about the 5 whys.
This question lead me to a few revelations. Specifically I found that the failures in the projects boiled down to the following list.
- Lack of requirements
- Wrong user
- Bad Management
- Not accepting reality
Lack of Requirements
Most projects failed because no one sat down and determined what the end user wanted or needed. Instead they decided to build something and see what happens. Usually they build something, show it to users and find out that with some changes it would be of value, but at that point they were out of money to make changes. Ironically if they had showed the product a cardboard box and walked through operation of device on paper they would have gotten the same feedback. Hence, I now try and live the motto of "Release early, release often, first release on paper."
Wrong User
This goes hand in hand with lack of requirements, however I have listed independent as it so common. That is you do your release on paper, but the demo is shown to project owner. For example if you are contracted to do a design you might do the operational walk through with your customer who is person contracting you. This person most like is not the end user of the product. So you get their feedback and make changes but they will never actually use the device as such you never get the feedback from the real end user an as such the requirements and feedback end up being incorrect or wrong.
Bad Management
The failure in requirements and wrong user really boils down to bad management. That is management is feedback control system for a project and as such if the project gets the wrong outcome, it is always a failure in management of the project. However there are some key failures in management that you can notice early in a project.
The first failure is the lack of architectural design. That is if team starts coding to see what they can do, then the project will fail. This has proven to be a 100% predictor of project failure in my experience. The analogy is building a house with no architectural drawings. As such you pretty much know that you will not get what you want in the end as you never really defined what you wanted.
Not Accepting Reality
Second failure in management is not accepting the reality. This is often failure in management but is so common that I broke it out. Here the project is over budget or time and they often keep pressing forward. When a project is over budget or time, it means something has to change. The longer you delay in accepting this reality the more costly the failure will be. Hence management needs to have a certain dispassion about the project and be willing to cancel project. If you are not willing to cancel a project you will most likely fail.
Engineers and team members can get into this trap too. For example if engineer is behind he might fail to tell management over fear he is not doing a good job. Here he is risking the entire team. That is accept the reality and let team know is always the best.
So if you are working on a project that you are certain it will fail, what can you do to help future you? Well that is the topic of the next blog article.